SolarCostData Live

Victoria

Live Victoria electricity market: spot price, load and generation.

· rendered 10:17 UTC. Numbers hold their last published value; nothing is interpolated.

Now

5-min real-time price

98.48M AUD/MWh

≈ 69.16D USD/MWh ECB rate 2026-10-23

RT5 · AUD/MWh ·

Demand

5439M MW

Last 24 hours

5-min real-time price · last 24 h (AUD/MWh)

Min 91.75, max 134.00, latest 98.48 AUD/MWh. Line breaks mark gaps longer than two reporting intervals.

Baseline building: 0 of 28 days.

Demand · last 24 h (MW)

Min 4501, max 5614, latest 5439 MW. Line breaks mark gaps longer than two reporting intervals.

Baseline building: 0 of 28 days.

Generation mix

This market publishes no generation mix.

Other markets

5-min real-time price in other markets

Demand in other markets

Sources

Source

AEMO (AU) · licence

Source: Australian Energy Market Operator (AEMO), NEMWEB

Latest batch fetched ·

Fuel mix not collected until AEMO's own Registration and Exemption List is available (Cowork 2026-10-23).

Embed

Free to embed with attribution. Our figures: CC BY 4.0. Source data keeps its own licence (Source: Australian Energy Market Operator (AEMO), NEMWEB).

Price widget (300 × 150)

Cite this

SolarCostData Data Desk (2026). NEM Victoria electricity data, live.solarcostdata.com/markets/vic/, accessed 2026-10-24. Source data: Source: Australian Energy Market Operator (AEMO), NEMWEB.

Download last 24 h: data.csv · data.json (CC BY 4.0 (our figures); source data: Source: Australian Energy Market Operator (AEMO), NEMWEB)

Victoria is the VIC1 region of the National Electricity Market. The page reports AEMO’s five-minute regional price and the regional demand figure for the state. Victoria sits in the middle of the southern grid, with links north to New South Wales, west to South Australia and across Bass Strait to Tasmania, so it often acts as a conduit that passes cheap or scarce power from one neighbour to another.

Its identity in the market is set by its links. AEMO gives the Heywood interconnector a nominal design limit of up to 650 MW in either direction, and describes Murraylink as a 220 MW DC cable. When those cables, or the Basslink cable to Tasmania, are full or limited, Victorian prices can separate from those of its neighbours, which makes the regional price a useful signal of where transfer limits bind.

Wind and rooftop solar add variability. A cold, still evening with a unit out can lift prices sharply; a windy spring day can push them below zero.

NEM time is AEST, ten hours ahead of UTC, while Victoria’s local clocks run an hour ahead of that whenever daylight saving applies, so local time and market time differ for part of the year. Prices are five-minute dispatch prices in Australian dollars. We do not show a generation mix for Victoria.

Facts

Not for trading or operational decisions. Provisional data.