Tasmania

Live Tasmania electricity market: spot price, load and generation.

· rendered 10:17 UTC. Numbers hold their last published value; nothing is interpolated.

Now

5-min real-time price

100.14M AUD/MWh

≈ 70.32D USD/MWh ECB rate 2026-10-23

RT5 · AUD/MWh ·

Demand

1093M MW

Last 24 hours

5-min real-time price · last 24 h (AUD/MWh)

Min 95.08, max 123.15, latest 100.14 AUD/MWh. Line breaks mark gaps longer than two reporting intervals.

Baseline building: 0 of 28 days.

Demand · last 24 h (MW)

Min 933, max 1150, latest 1093 MW. Line breaks mark gaps longer than two reporting intervals.

Baseline building: 0 of 28 days.

Generation mix

This market publishes no generation mix.

Other markets

5-min real-time price in other markets

Demand in other markets

Sources

Source

AEMO (AU) · licence

Source: Australian Energy Market Operator (AEMO), NEMWEB

Latest batch fetched ·

Fuel mix not collected until AEMO's own Registration and Exemption List is available (Cowork 2026-10-23).

Embed

Free to embed with attribution. Our figures: CC BY 4.0. Source data keeps its own licence (Source: Australian Energy Market Operator (AEMO), NEMWEB).

Price widget (300 × 150)

Cite this

SolarCostData Data Desk (2026). NEM Tasmania electricity data, live.solarcostdata.com/markets/tas/, accessed 2026-10-24. Source data: Source: Australian Energy Market Operator (AEMO), NEMWEB.

Download last 24 h: data.csv · data.json (CC BY 4.0 (our figures); source data: Source: Australian Energy Market Operator (AEMO), NEMWEB)

Tasmania is the TAS1 region of the National Electricity Market, an island at the end of a single undersea cable. The page shows AEMO’s five-minute spot price and the regional demand. The defining feature is hydropower: Tasmania’s generation is predominantly hydro, and the dams store water that can be turned into power on short notice.

That makes Tasmanian prices a story of water and wires. In a wet period with full storages the island exports power to Victoria through Basslink, and the price follows the mainland. When storages are low, the same cable lets the island import, and the hydro operator has to decide when to hold water back. Price differences with Victoria therefore tell you more about the cable and about reservoir management than about short-term demand.

Basslink is rated at about 500 MW, which is small compared with the mainland regions, so Tasmania can be cut off from mainland prices when the link is full or out of service.

We show no generation mix for Tasmania, so the hydro share is not displayed here. Prices are five-minute dispatch prices in Australian dollars, and NEM time is AEST, ten hours ahead of UTC, although Tasmania’s local clocks run an hour ahead of it whenever daylight saving applies.

Facts

Not for trading or operational decisions. Provisional data.