Peak demand in NEM Queensland: 7233 MW, 2026-10-24 08:25 UTC
Demand peak in NEM Queensland. Record since 2026-10-23, the first date in our data for this series.
State checked
State: confirmed · notable (beat the previous confirmed record)
7233M MW
- Interval starting 2026-10-24T08:25:00Z (300 s)
- First seen 2026-10-24T08:30:21Z
- Confirmed by a second batch fetched 2026-10-24T08:45:25Z
Data: Source: Australian Energy Market Operator (AEMO), NEMWEB. source licence Derived numbers and charts: CC BY 4.0, SolarCostData Data Desk (licence). Source data keeps its own licence.
Context
Demand peak in NEM Queensland: 7233 MW in the 5-minute interval starting 2026-10-24 08:25 UTC. This is a record since 2026-10-23, the first date in our data for this market. The window is short, so the record says nothing about earlier years.
It beat the previous confirmed record of 5545 MW, set at 2026-10-23 19:20 UTC, by 1688.45 MW (30.5%). That earlier record stays in the chain as superseded and remains visible at /records/demand-peak-qld-1792783200/.
Conditions in the data at the same time: NEM-QLD1 price rt5 103.8 AUD/MWh (reading at 08:25 UTC). These are the readings nearest to the record interval in the same database, shown for context only; they do not explain the record on their own.
First seen in a batch fetched at 2026-10-24 08:30 UTC (payload f7a22fd121). It was confirmed after a second batch fetched at 2026-10-24 08:45 UTC (payload f6f2ed624b): a later batch arrived, this feed does not republish old intervals, and the stored point stayed unrevised, unflagged and within 2%.
For comparison, the next most extreme valid reading in the same series is 7200.6 MW at 2026-10-24 08:30 UTC, out of 43 readings in the window.
Records are built from provisional operator data that can be revised, so each one is checked against later batches before it is confirmed and can be retracted if the source changes it. Readings outside market bounds, with a wrong unit, flagged by a quality gate or showing a price jump without a matching load change are rejected and never listed. See the methodology page for the full rules. Not for trading or operational decisions. Provisional data.
Previous record in this chain: 5545 MW, state superseded.
Not for trading or operational decisions. Provisional data.